Definition
Deployment is the process of making a software application available in a target environment by building release artifacts, provisioning infrastructure, executing the release, and verifying system health. Modern deployment practices emphasize automation, reproducibility, and safety mechanisms including rolling deployments, canary releases, blue-green strategies, and automatic rollback on failure. The BEAM virtual machine adds unique deployment capabilities through hot code upgrades, where running systems can be updated without restarting processes or dropping connections.
Deployment is the final stage of the delivery pipeline, where compiled, tested, and validated code transitions from the development environment to production. The quality of deployment automation directly determines two of the four DORA metrics: deployment frequency and lead time for changes. The Prismatic Platform's deployment pipeline embodies the NMND doctrine -- every deployment is fully automated, health-verified, and rollback-capable.
Overview
Deployment Strategy Comparison
| Strategy | Downtime | Risk | Rollback Speed | Prismatic Usage |
|---|---|---|---|---|
| Rolling | Zero | Low | Instance-level (~30s) | Primary production strategy |
| Blue-Green | Near-zero | Very Low | Instant switch (~5s) | Database migration releases |
| Canary | Zero | Lowest | Percentage-based (~10s) | Feature flag releases |
| Hot Code Upgrade | Zero | Medium | Appup-based (~1s) | Critical patches |
| Recreate | Minutes | Highest | Redeploy (~2min) | Development only |
Deployment Pipeline Flow
flowchart LR
subgraph Phase1["Phase 1: Pre-Deploy"]
A[Quality Gates] --> B[Doctrine Validation]
B --> C[Test Suite]
C --> D[Security Scan]
end
subgraph Phase2["Phase 2: Build"]
E[Docker Build] --> F[Mix Release]
F --> G[Push to Registry]
end
subgraph Phase3["Phase 3: Deploy"]
H[Database Migrations] --> I[Rolling Deploy]
I --> J[Health Checks]
end
subgraph Phase4["Phase 4: Verify"]
K[Smoke Tests] --> L[Functional Tests]
L --> M[Performance Check]
end
Phase1 --> Phase2
Phase2 --> Phase3
Phase3 --> Phase4
M --> N{All Passed?}
N -->|Yes| O[Deploy Complete]
N -->|No| P[Automatic Rollback]DORA Metrics Context
The four DORA metrics measure deployment effectiveness:
| Metric | Elite | High | Medium | Prismatic Target |
|---|---|---|---|---|
| Deploy Frequency | Multiple/day | Daily-weekly | Monthly | Multiple/day |
| Lead Time | <1 hour | 1 day-1 week | 1-6 months | <30 minutes |
| Change Failure Rate | 0-15% | 16-30% | 16-30% | <10% |
| MTTR | <1 hour | <1 day | 1 day-1 week | <15 minutes |
Technical Deep Dive
Elixir Releases
Elixir releases, built with mix release, produce self-contained packages that include the Erlang runtime, compiled BEAM files, and boot scripts. These releases do not require Elixir or Erlang to be installed on the target system.
# mix.exs release configuration
def project do
[
releases: [
prismatic: [
include_executables_for: [:unix],
applications: [runtime_tools: :permanent],
steps: [:assemble, :tar],
strip_beams: true
]
]
]
end
Key release features:
- Self-contained: No Elixir/Erlang installation needed on target
- Boot scripts: Automatic startup with
bin/prismatic start - Config providers: Runtime configuration from environment variables
- Remote console:
bin/prismatic remotefor production debugging - Health checks: Built-in liveness and readiness probes
Docker Build Pipeline
The platform uses multi-stage Docker builds for minimal, secure images:
# Stage 1: Build
FROM hexpm/elixir:1.16.0-erlang-26.2-debian-bullseye AS builder
ENV MIX_ENV=prod
WORKDIR /app
COPY mix.exs mix.lock ./
COPY apps/*/mix.exs ./apps/
RUN mix deps.get --only prod && mix deps.compile
COPY . .
RUN mix assets.deploy && mix release prismatic
# Stage 2: Runtime (minimal image)
FROM debian:bullseye-slim AS runner
RUN apt-get update && apt-get install -y libstdc++6 openssl libncurses5 \
&& rm -rf /var/lib/apt/lists/*
COPY --from=builder /app/_build/prod/rel/prismatic /app
ENV HOME=/app
WORKDIR /app
HEALTHCHECK --interval=30s --timeout=5s --retries=3 \
CMD curl -f http://localhost:4000/health || exit 1
CMD ["bin/prismatic", "start"]Fly.io Deployment
The Prismatic Platform deploys to Fly.io, which provides globally distributed edge hosting with built-in TLS, auto-scaling, and rolling deployments:
# fly.toml
app = "prismatic-prod"
primary_region = "fra"
[build]
dockerfile = "Dockerfile"
[deploy]
strategy = "rolling"
release_command = "bin/prismatic eval 'Prismatic.Release.migrate()'"
[http_service]
internal_port = 4000
force_https = true
[[http_service.checks]]
grace_period = "30s"
interval = "15s"
method = "GET"
path = "/health"
timeout = "5s"
[processes]
app = "bin/prismatic start"Rolling Deployment Sequence
sequenceDiagram
participant Dev as Developer
participant CI as GitLab CI
participant Fly as Fly.io
participant I1 as Instance 1
participant I2 as Instance 2
participant LB as Load Balancer
Dev->>CI: Push to main
CI->>CI: Run quality gates
CI->>CI: Build Docker image
CI->>Fly: Deploy command
Note over Fly,LB: Rolling deployment begins
Fly->>I2: Start new version
I2->>I2: Run migrations
I2->>LB: Health check passes
LB->>I2: Route traffic
Fly->>I1: Drain connections
I1->>LB: Remove from rotation
Fly->>I1: Start new version
I1->>LB: Health check passes
LB->>I1: Route traffic
Note over Fly,LB: Rolling deployment complete
Fly->>Dev: Deploy success notificationHot Code Upgrades
The BEAM's unique hot code upgrade capability allows updating running systems without restarting processes:
defmodule Prismatic.Release.HotUpgrade do
@moduledoc """
Hot code upgrade support for zero-downtime patches.
The BEAM can load two versions of a module simultaneously:
the 'current' version and the 'old' version. Running processes
continue with the old version until they make a fully-qualified
call (Module.function), at which point they switch to the current
version.
"""
@spec upgrade(String.t()) :: :ok | {:error, term()}
def upgrade(version) do
# Generate appup files describing the upgrade path
with :ok <- generate_appups(version),
:ok <- build_relup(version),
:ok <- apply_upgrade(version) do
:ok
end
end
defp generate_appups(version) do
# Appup files describe how to upgrade each application
# from the old version to the new version
{:ok, _} = :release_handler.create_RELEASES(
~c"releases",
~c"releases/#{}/prismatic.rel"
)
:ok
end
defp build_relup(version) do
case :systools.make_relup(
~c"releases/#{}/prismatic",
[~c"releases/current/prismatic"],
[~c"releases/current/prismatic"]
) do
:ok -> :ok
{:error, _, reason} -> {:error, reason}
end
end
defp apply_upgrade(version) do
case :release_handler.install_release(~c"#{}") do
{:ok, _, _} -> :ok
{:error, reason} -> {:error, reason}
end
end
endDatabase Migration Strategy
Migrations run as a release command before new code deploys, ensuring schema compatibility:
defmodule Prismatic.Release do
@moduledoc """
Release tasks for database migration and seed data.
Called via: bin/prismatic eval 'Prismatic.Release.migrate()'
"""
@app :prismatic
@spec migrate() :: :ok
def migrate do
load_app()
for repo <- repos() do
{:ok, _, _} = Ecto.Migrator.with_repo(repo, &Ecto.Migrator.run(&1, :up, all: true))
end
:ok
end
@spec rollback(module(), integer()) :: :ok
def rollback(repo, version) do
load_app()
{:ok, _, _} = Ecto.Migrator.with_repo(repo, &Ecto.Migrator.run(&1, :down, to: version))
:ok
end
defp repos do
Application.fetch_env!(@app, :ecto_repos)
end
defp load_app do
Application.load(@app)
end
endHealth Check Implementation
Every deployment must pass health verification:
defmodule PrismaticWeb.HealthController do
@moduledoc """
Health check endpoint for deployment verification.
Returns 200 when all critical subsystems are operational.
"""
use PrismaticWeb, :controller
@spec check(Plug.Conn.t(), map()) :: Plug.Conn.t()
def check(conn, _params) do
checks = [
{:database, &check_database/0},
{:ets, &check_ets/0},
{:pubsub, &check_pubsub/0},
{:telemetry, &check_telemetry/0}
]
results = Enum.map(checks, fn {name, check_fn} ->
try do
{name, check_fn.()}
rescue
e -> {name, {:error, Exception.message(e)}}
end
end)
all_healthy = Enum.all?(results, fn {_, status} -> status == :ok end)
status = if all_healthy, do: 200, else: 503
json(conn, %{
status: if(all_healthy, do: "healthy", else: "degraded"),
checks: Map.new(results),
version: Application.spec(:prismatic, :vsn) |> to_string(),
uptime: System.monotonic_time(:second)
})
|> put_status(status)
end
defp check_database do
Prismatic.Repo.query!("SELECT 1")
:ok
rescue
_ -> {:error, "database unreachable"}
end
defp check_ets do
case :ets.info(:prismatic_cache) do
:undefined -> {:error, "ETS table missing"}
_ -> :ok
end
end
defp check_pubsub do
Phoenix.PubSub.node_name(Prismatic.PubSub)
:ok
rescue
_ -> {:error, "PubSub unavailable"}
end
defp check_telemetry do
:telemetry.execute([:prismatic, :health, :check], %{value: 1}, %{})
:ok
end
endDeployment Automation
The /deploy Skill
The Prismatic Platform provides a /deploy skill that orchestrates the full deployment pipeline:
# Full production deployment with validation
just deploy-production
# Staging deployment
just deploy-validate staging
# Dry run (preview without executing)
just deploy-dry-run production
# Emergency rollback
just production-recoverDeployment Decision Tree
flowchart TD
A[Code Change Ready] --> B{What type of change?}
B -->|Feature| C[Full deploy pipeline]
B -->|Hotfix| D{Critical?}
B -->|Config only| E[Config deploy - no build]
D -->|Yes| F[Hot code upgrade if possible]
D -->|No| C
C --> G[Pre-deploy checks]
G --> H{Quality gates pass?}
H -->|Yes| I[Build Docker image]
H -->|No| J[Fix quality issues first]
I --> K{Database migration needed?}
K -->|Yes| L[Run migration first]
K -->|No| M[Rolling deploy]
L --> M
M --> N[Health checks]
N --> O{All healthy?}
O -->|Yes| P[Deploy complete]
O -->|No| Q[Automatic rollback]
F --> R[Generate appup]
R --> S[Apply upgrade]
S --> T{Upgrade successful?}
T -->|Yes| P
T -->|No| U[Full restart fallback]
U --> MPost-Deploy Verification
# Smoke test (4 endpoints)
just smoke-test production
# Full post-deploy validation
just post-deploy-validate production
# Check current production status
just production-statusRollback Strategy
flowchart TD
A[Deploy Failure Detected] --> B{Failure Type?}
B -->|Health check timeout| C[Wait + retry once]
B -->|Application crash| D[Immediate rollback]
B -->|Migration failure| E[Migration rollback + app rollback]
B -->|Performance degradation| F[Canary rollback]
C --> G{Retry passed?}
G -->|Yes| H[Deploy continues]
G -->|No| D
D --> I[Fly.io rollback to previous release]
E --> J[Run down migration]
J --> I
F --> K[Route traffic to old version]
K --> L[Investigate and fix]
I --> M[Verify rollback health]
M --> N[Alert team]Best Practices
- Automate the entire deployment pipeline -- manual steps introduce inconsistency and risk. Every deployment should be a single command (
just deploy-production). - Run database migrations before application deployment -- ensures the schema is ready before new code attempts to use it. Make migrations backwards-compatible.
- Implement health checks -- every deployed instance must pass health verification before receiving traffic. Check database, ETS, PubSub, and critical GenServers.
- Use rolling deployments -- update instances one at a time to maintain availability during releases.
- Maintain deployment parity -- staging and production environments should be identical in configuration and infrastructure.
- Tag every deployment -- associate Git SHAs with deployed versions for traceability and rollback.
- Make migrations reversible -- every
upmigration should have a correspondingdownfor safe rollback. - Monitor post-deploy -- watch error rates, latency percentiles, and telemetry dashboards for 30 minutes after deploy.
- Limit blast radius -- deploy to staging first, canary to a subset of production, then full rollout.
- Never deploy on Fridays -- unless the fix is more critical than the risk of weekend incidents.
Common Pitfalls
| Pitfall | Impact | Prevention |
|---|---|---|
| Missing health checks | Broken instances receive traffic | Always implement /health endpoint |
| Non-reversible migrations | Can't rollback safely | Write both up and down migrations |
Mix.env() in releases | Crash at startup | Use Application.compile_env |
| Missing env variables | Silent failures or crashes | Validate all required env at boot |
| Large Docker images | Slow deploy, wasted bandwidth | Multi-stage builds, strip beams |
| No rollback plan | Extended outage on failure | Test rollback procedure regularly |
Related Terms
- Docker -- containerization for reproducible deployment artifacts
- Fly.io -- platform hosting Prismatic production deployments
- CI/CD -- continuous integration and delivery pipeline
- GitLab CI -- CI/CD system driving automated deployments
- Hot Code Upgrade -- BEAM capability for zero-downtime updates
- Health Check -- verification that deployed instances are functional
- Delivery -- complete pipeline from commit to production
- Release -- self-contained deployment artifact
- Migration -- database schema changes run during deployment
- Supervision Tree -- fault tolerance structure that survives deployments
- Configuration -- runtime settings applied during deployment
- Telemetry -- observability for post-deploy monitoring
- Rollback -- reverting to a previous deployment version
- GitOps -- Git-driven deployment automation
See Also
- Architecture -- platform deployment architecture
- Technologies -- deployment infrastructure and tooling
- Production Validation -- three-phase deploy pipeline doctrine
Connect & Contribute